Barrington's First Presbyterian Church

Renovation Project

First Presbyterian Church of Barrington 

100th Anniversary Restoration and Renovation Project 

Preserving Our Past and Building a Vision for Our Future

Project update August 27, 2010

Since our Dedication Service in March work has not stopped on the restoration and renovation of our church building.  We are now into “Phase III.”  The original brief description of this phase was that it is “general cosmetic improvements.  This is the entire painting of the exterior, interior painting and refinishing throughout and new floor coverings throughout.”

As you can see Phase III was designated to cover Cosmetic Finishes for most of the church building.  However there are some important items that should be added.

Following is a brief description of items that need to be addressed:

Install French drains with sump pumps in the basement fellowship hall

Install heater/air-conditioning in the three new rooms

Repair or replace the rain gutters

Power washes prior to painting the entire exterior of the building.

Install heat in the two new restrooms

Put new floor coverings in the three new rooms

Remodel the down stairs fellowship room and hallway (walls and floor)

Move the church office upstairs to room 20 and or remodel the existing room.

            Clean and paint the entire Sanctuary

            Put new rugs in the Sanctuary

            Remodel the Kitchen

To date some of these items have been completed.

French drains with sump pumps have been installed along most of the South wall and about half of the West wall.  These were needed because during heavy rain or snow-melt water would seep into the down stairs fellowship room.  After many years the base of the wall paneling was starting to rot.

An efficient heater/air-conditioning has been installed in the new Pastor’s office.

We have hired a painter who is now power washing and painting the entire outside of the church building.  He is also repairing some damaged gutters.  Weather permitting he plans to be done with in the next week.

In addition to the photos below there are more under “Pictures.”

 

 

 

 

 

 

 

 

 

 

  

  

  

 

 

 

 

 

 

 

 

 

 

 

 

 

2009_1007Image0011 

2009_1007Image0010 

2009_1007Image0008 

2009_1007Image0007 

2009_1007Image0005 

2009_1007Image0003 

2009_1007Image0001 

SBob K Pictures 107 

SBob K Pictures 103 

SBob K Pictures 102 

S2009_0915Image0009 

S2009_0915Image0006 

S2009_0915Image0003 

S2009_0915Image0002 

SBob K Pictures 093 

SBob K Pictures 092 

SBob K Pictures 090 

SBob K Pictures 089 

SBob K Pictures 088 

LBob K Pictures 083 

2009_0822Image0004c 

2009_0822Image0007f 

2009_0822Image0006e 

011a 

2009_0822Image0008g 

006 a 

  

2009_0822Image0002b 

2009_0822Image0001a 

010a 

002a 

003a 

  

2009_0814Image0007 

  

2009_0814Image0003 

2009_0814Image0002 

2009_0814Image0001 

  

2009_0807Image0043 

2009_0807Image0051 

 

2009_0807Image0049 

2009_0807Image0048 

2009_0807Image0045 

2009_0619Image0021 

2009_0619Image0020 

2009_0617Image0008 

2009_0617Image0010 

  2009_0617Image0009 

  2009_0607Image0008 

2009_0607Image0009 

2009_0607Image0007 

   

 

 

 

   

 

 

  

Blog at WordPress.com.